Stage 3: East Coast – Berwick to Colchester – Completed

This is the route Jon took and not all the places listed or the marked way points on the maps were stops.

Stage 3 – August: From Berwick-upon-Tweed to Colchester completed

Pre – stage Journeys

Day -3 August 2 to Boroughbridge
Via: Worcester, Droitwich, Bromsgove, National Motorcycle Museum (B92 0EJ) approx 11.30am, Wetherby, Boroughbridge

Day -2 August 3 Boroughbridge to Northumberland 
Via: Swaledale, Barnard Castle, Corbridge & Great Bavington

Day -1 August 4 to Berwick upon Tweed
via: Wallington Hall NT (NE61 4AR), Carter Bar, Kelso, Coldstream, Berwick on Tweed

August 5 – Day 1: THE START of Stage 3  Berwick to Stamfordham

Via: Lindisfarne Castle NT (Tide safe crossing times: 10:55 until 17:10)
Bamburgh Castle
Seahouses
Dunstanburgh Castle NT 
Stamfordham

August 6 – Day 2: Stamfordham to Middlesborough

Via: Seaton Delaval Hall NT
Whitley Bay
South Shields
Souter Lighthouse NT
Sunderland
Hartlepool
Middlesbrough
 

August 7- Day 3: Ormsby Hall to Robin Hood Bay

Via: Ormesby Hall
North York Moors National Park
Whitby
Robin Hood Bay
Fylingthorpe

August 8- Day 4: Rest Day

August 9 – Day 5: Robin Hood Bay to Hull

Ravenscar Alum works
Scarborough
Flamborough head
Bridlington
Hornsea
Aldbrough
Spurn Point
Hull

August 10 – Day 6: Hull to Hunstanton

Via:
Gunby Hall NT
Skegness
Boston
Holbeach
Wisbech
Brandon Creek (The Ship Inn)
Kings Lynn
Hunstanton

>August 11 – Day 7: Hunstanton to Ipswich

Via: Brancaster Estate
Felbrigg Hall NT
Cromer
Horsey Windpump NT
Great Yarmouth
Lowestoft
Aldeburgh
Sutton Hoo
Ipswich
Castle Hedingham

August 12 – Day 8: Rest day (Pin Mill NT/Bourne Mill NT)

August 13 – Day 9: Ipswich to Sandy

Via: Chelmsford BBC
Flatford Mill NT
Bishops Stortford
The James Whale Fund offices in Harston CB22 7PZ
Sandy

August 14 – Day 10: Sandy to Leominster

Via: Toast Design in Banbury OX16 0TF
Coventry
Worcester
Leominster

End of Stage 3